top of page

KP

Interior

Limited

Our Featured Projects

Christchurch Hospital 1
Christchurch Hospital 1

The first plasta hand is used to close spaces on its surface (such as screws) and to join the pieces.

Christchurch Hospital 2
Christchurch Hospital 2

The second coat of plasta is used to correct the lack of mass of the first coat.

Christchurch Hospital 3

The third plasta hand is used to eliminate spaces that are still present, preparing the part for the last process.

Christchurch Hospital 3
Christchurch Hospital 4
Christchurch Hospital 4

The last process before the painting is the sandpaper, which must be executed after the application of the "Top Colt".

 

Christchurch Hospital 5
Christchurch Hospital 6
Christchurch Hospital 6

The "Skylight" allows you to enjoy the natural light, but for this to be possible, the work of preparation and painting of the space must be carried out by a specialized professional.

Stay In Touch.

KP Interior Limited

PO Box 21078, Edgeware

264 Knowles Street, Mairehau

Christchurch 8052

New Zealand

 

kpinteriorsltd@gmail.com

 

Tel: (03) 966 3615

Fax: (03) 966 3615

  • Facebook Social Icon
  • Black Instagram Icon
contact
Christchurch Hospital 5

We present the installation process of "Metal Drywall Corner Bead".

bottom of page